Bolivia, Peru in race to build PE plant for Pacific market

Bolivia, Peru in race to build PE plant for Pacific market
(Saturday, November 29, 2014) 15:41

Bolivia and Peru are both studying plans to build new polyethylene (PE) plants, and whichever country is first will likely achieve a dominant position in the Pacific-coast market, a consultant said on Friday.

As a result, whichever plant is second will have a difficult time justifying itself, said Jorge Buhler-Vidal, director of Polyolefins Consulting. He made his comments during the PetroChemical Alliance seminar ahead of the Latin American Petrochemical Association (APLA) meeting.

Bolivia is developing an integrated PE complex that will have a capacity of 350,000 tonnes/year of high density PE (HDPE), 200,000 tonnes/year of low density PE (LDPE) and 200,000 tonnes/year of linear low density PE (LLDPE). Start-up is expected in 2022.

Italian firm Tecnimont conducted a conceptual engineering study of the PE project. The complex will rely on ethane supplied from a natural gas liquid (NGL) separation plant in Gran Chaco. Preliminary testing for the plant was scheduled to start in October.

Peru, meanwhile, is in the process of setting up a multi-sectoral committee to advance the development of a petrochemical complex in the south of the country.

The capacity to develop a petrochemical hub in the region was given a recent boost after Peru’s government awarded a 34-year concession to build and operate a 1,000 km pipeline that will bring natural gas from the Camisea fields in central Peru and transport it further south along the country’s Pacific coastline. The pipeline could be transporting gas by 2018 or 2019.

The first plants to be built at the proposed complex are expected to use methane to produce fertilizers and explosives, and ethane to produce ethylene and polyethylene (PE).

The two facilities could require an investment of more than $6bn.

In 2012, Peru’s state-run oil company Petroperu and Brazilian petrochemical major Braskem said they would study the viability of a 1.2m tonne/year ethylene/PE plant that would use ethane from the Camisea fields.

The plant would have been the largest PE plant on the western coast of North and South America.

Email is required
Characters left: 500
Comment is required