The deal was signed on Tuesday in a ceremony held in the presence of Marziyeh Shahdaei, deputy petroleum minister in petrochemical affairs and head of the National Petrochemical Company (NPC), and some of the Linde executives.
The 12-month deal has been signed with €34.940m of financial credit.
Located at Assalouyeh Petrochemical Company, southern Iran, Kina Petrochemical Plant was launched in 2012 as the 12the olefin plant of the country.
The FEED is basic engineering which comes after the Conceptual design or Feasibility study.
The FEED design focuses the technical requirements as well as rough investment cost for the project. The FEED can be divided into separate packages covering different portions of the project.