A ceremony was held at the facility on Tuesday, July 26, with Masoumeh Ebtekar and National Petrochemical Company (NPC) chief Marziyeh Shahdaei to launch the project.
All the machinery and equipment required for construction of the unit were supplied by Iranian manufacturers with a cost of nearly IRR700b.
The unit has the capacity of treating 90 cubic meters of water per hour which can be sent back to the nature after treatment.